![[withdrawn] gobians sewer, linford, east tilbury, essex: proposal for factual change](https://www.gov.uk/assets/static/govuk-opengraph-image-03837e1cec82f217cf32514635a13c879b8c400ae3b1c207c5744411658c7635.png)
[withdrawn] gobians sewer, linford, east tilbury, essex: proposal for factual change
- Select a language for the TTS:
- UK English Female
- UK English Male
- US English Female
- US English Male
- Australian Female
- Australian Male
- Language selected: (auto detect) - EN
Play all audios:

* Notice GOBIANS SEWER, LINFORD, EAST TILBURY, ESSEX: PROPOSAL FOR FACTUAL CHANGE Published 13 July 2015 THIS NOTICE WAS WITHDRAWN ON 17 AUGUST 2015 YOUR FEEDBACK IS BEING ANALYSED. The
Environment Agency consulted on this proposal for change between 13 July 2015 and 16 August 2015. © Crown copyright 2015 This publication is licensed under the terms of the Open Government
Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-government-licence/version/3 or write to the Information Policy Team, The National
Archives, Kew, London TW9 4DU, or email: [email protected]. Where we have identified any third party copyright information you will need to obtain permission from the copyright
holders concerned. This publication is available at
https://www.gov.uk/government/publications/gobians-sewer-linford-essex-proposal-for-factual-change/gobians-sewer-linford-east-tilbury-essex-proposal-for-factual-change The Environment Agency
proposes to change the existing main river map at Gobians Sewer, Linford, East Tilbury, Essex. It proposes the change as a ‘determination’ under section 193C(1) of the Water Resources Act
1991. A determination is a formal decision to change the main river map. The proposed determination is that we will correct the main river map between national grid reference (NGR)
TQ6817279779 and NGR TQ6948079170. The watercourse that is no longer to be considered as a Main River is shown as a ‘deletion’ on the main river consultation. The change means that the map
would show the correct location of the main river watercourse. Gobians Sewer no longer exists as a passage for water on the current main river alignment as it was diverted to the south in
1980 as part of the Mucking tip works. This factual change is required to reflect this alteration in the main river map. 1. HOW TO VIEW THE PROPOSED CHANGES You can see the proposals on the
main river consultation map. The red line (‘deletion’) on the map is the incorrect line, which would be deleted. Or you can see the main river consultation maps at: Iceni House Cobham Road
Ipswich Suffolk IP3 9JD 2. YOUR CHANCE TO COMMENT If you have any comments or queries about this proposal you can email [email protected] or write to: The PSO Team Environment
Agency Iceni House Cobham Road Ipswich Suffolk IP3 9JD Please quote reference number ESNFSF_00004 when you contact the Environment Agency. Send your comments to the Environment Agency by 15
August 2015. Back to top